ページの先頭です

ページ内を移動するためのリンク
本文(c)へ

COP28 国連気候変動枠組条約第28回締約国会議

The 28th UN Climate Change Conference
of the Parties (COP28)

Environmental Restoration Efforts and Reconstruction Progress in FukushimaThe 28th UN Climate Change Conference (COP28)

Interim storage

Interim storage

Interim Storage Facility is used to manage removed soil and waste materials. It is located in the area surrounding the TEPCO's Fukushima Daiichi Nuclear Power Station, and the towns of Okuma and Futaba have made a very serious decision to accept it. It covers an area of approximately 1,600 hectares.

Interim Storage Facility

Reception / separation facility (exterior view)

Reception / separation facility (interior view)

Soil storage facility

Temporary treatment facility

Waste storage facility

Transported to Interim Storage Facility

  • When transporting soil and waste to the Interim Storage Facility, MOE makes safety the first priority, and ensure transportation will be carried out with the understanding of local communities.
  • To date, approximately 13.38 million m3 of removed soil and waste (including those in Restricted area) has been transported to the Interim Storage Facility (as of the end of Dec. 2022).